Generally this process works seamlessly. You just need to open up the older iX Developer project in iX Developer 2.0 and everything functions as before. As issues come up we will post there solution here.
Best Regards,
Mark Monroe

Beijer Electronics, Inc. | Applications Engineer

mark.monroe
Posts: 824
Joined: Tue Mar 13, 2012 9:53 am

Trend Chart History must be set when changing from 1.31 to 2

Post by mark.monroe »

In iX 1.31 the user saved the Trend Chart data for later use by selecting the "History" check box. In iX 2.0 if you want to save the Trend Chart data for later viewing you need to assign a "Logger Item". That way all data logged for later use will go through a Datalogger.

When you open up a 1.31 project in iX 2.0 that includes a Trend Chart with the "History" check box checked, it does not know what Datalogger you want to use to save the data with. It defaults to not saving the Trend Chart data for later use. If you want to have the Trend Chart save data for later use, you need to select a Datalogger to use to save the data through.
Snap 2012-06-05 at 10.43.01.jpg
Snap 2012-06-05 at 10.43.01.jpg (84.82 KiB) Viewed 17939 times
Snap 2012-06-05 at 10.55.08.jpg
Snap 2012-06-05 at 10.55.08.jpg (101 KiB) Viewed 17939 times
Best Regards,
Mark Monroe

Beijer Electronics, Inc. | Applications Engineer

Post Reply